Solar · Bitcoin mining · AI compute

Farm Futures builds one energy system for two computing workloads — Bitcoin mining and AI compute — backed by solar generation and industrial power. Explore the infrastructure, model the energy flow, and invest when you are ready.

Figures are labeled verified, estimated, planned or target — never blurred together.

Solar Solar array Grid power Energy management balance · allocate Bitcoin mining 70% allocation AI computing 30% allocation System schematic
Scroll

The project

One site, two workloads, one power system

Most computing projects buy one kind of power and run one kind of workload. Farm Futures is designed differently: solar energy and industrial electricity feed a shared power system that runs both Bitcoin mining and AI computing, with an energy management layer deciding where each megawatt goes.

Solar daylight power Grid industrial supply Power system managed & metered allocations Bitcoin 70% AI compute 30%

What it is

An infrastructure project combining energy generation, Bitcoin mining and AI computing under one roof.

How it earns

The computing work the infrastructure performs — mining rewards and AI compute services — is the intended source of revenue.

Why hybrid

Two workloads sharing one power system can be balanced against each other, making better use of every megawatt.

The project's operating activities and your investment terms are separate. Full terms are shown before you confirm any investment.

Infrastructure

Infrastructure at a glance

Every figure below carries a status label. We publish values as verified only when they are backed by real operating data — anything else stays marked as planned, estimated or unavailable until it is confirmed.

Total land areaEstimate
50,950m²

About 50,950 m² of land.

Built areaEstimate
11,000m²

About 11,000 m² in use: mining halls and solar.

Mining hallsEstimate
3,000m²

About 3,000 m², plus a new hall for AI GPU servers.

Wind turbinesEstimate
12turbines

On the wider site of about 500,000 m².

Private operationEstimate
5years

About five years before opening to the public.

Running equipmentEstimate
30M USD

Approximate value of the mining and GPU fleet.

Bitcoin mining allocationPlanned
70%

Initial agreed allocation — editable by an administrator.

AI computing allocationPlanned
30%

Initial agreed allocation — editable by an administrator.

Solar capacityEstimate
18MWp

About 18 MWp of solar panels on site.

Solar energy productionEstimate
28GWh/yr

About 40% of the farm's yearly energy.

Available electricityEstimate
8MW

Average from solar, wind and other sources: about 70 GWh a year.

Mining fleet consumptionEstimate
6.4MW

Continuous draw of the mining fleet.

Mining machinesEstimate
1,980machines

Antminer S19 Pro.

Fleet hashrateEstimate
207PH/s

About 207–218 PH/s for the whole fleet.

Energy model

Interactive energy–compute flow

A live model of how available power splits between Bitcoin mining and AI computing. The values come from the project’s energy settings — administrators update them in the admin panel. Every result shown here is an estimate, not live operating data.

Bitcoin mining4.5 MW · 70%AI computing1.9 MW · 30%Unused reserve1.6 MWSolar3.2 MWGrid4.8 MWPower system6.4 MW used153.6 MWh/day · 56.1 GWh/yr (modeled)
Estimated utilization
6.4 of 8 MW
Solar share of supply
3.2 of 8 MW
Power to Bitcoin mining
4.5 MW
Power to AI computing
1.9 MW
Estimate Modeled from the project’s configured energy settings — not live operating data. Values are maintained by administrators. Solar Grid Bitcoin AI

Investment plans

Investment plans

Three tiers, one set of conditions. Return information appears only when it has been approved and configured — never before.

Starter

$300 – $999

A first step into the project. Suitable for visitors who want to start small and follow how the infrastructure develops.

Estimated annual return 21–25% per year ≈ $63 – $75 per year at the $300 minimum — illustrative

Illustrative annual range of 21–25% per year, distributed according to the project’s profit-distribution schedule. Principal stays locked for six months from confirmation.

Minimum investment $300. Subject to the six-month principal lock-up period and the full investment terms shown at checkout.
Choose Starter

Pro

$5,000+

For larger commitments. Terms, conditions and any return assumptions are confirmed with you before payment.

Estimated annual return 31–36% per year ≈ $1,550 – $1,800 per year at the $5,000 minimum — illustrative

Illustrative annual range of 31–36% per year, distributed according to the project’s profit-distribution schedule. Principal stays locked for six months from confirmation.

Minimum investment $5,000. Subject to the six-month principal lock-up period and the full investment terms shown at checkout.
Choose Pro

Compare all plans & conditions

Partner leaderboard

Bring people in, climb the board

Channel owners and creators who bring new investors are ranked every round. The top 15 are shown here by name, and the first three earn +1.5% / +1% / +0.5% on top of their 1% for the whole next round.

Codes closed · next round opens 24 Oct

  1. 1st Open spot +1.5% next round
  2. 2nd Open spot +1% next round
  3. 3rd Open spot +0.5% next round
The board is emptyThe first verified referral of this round takes 1st place.
See the full leaderboard

The journey

How it works

From creating an account to tracking your investment — the whole journey in six steps.

  1. Register

    Create an account with your email and a password.

  2. Verify your account

    Confirm your email where required.

  3. Review the information

    Read the project, the plans and the risk disclosure.

  4. Select a plan and amount

    Choose the tier and figure that suit you.

  5. Complete payment

    Send USDT over a supported network.

  6. Wait for verification

    The backend confirms the transaction — a submitted reference alone is not confirmation.

See the full eight-step investor journey

Why us

Why Farm Futures

The project is built on real infrastructure choices, not promises.

Bitcoin mining infrastructure

Specialized mining machines secured and cooled inside a purpose-built facility.

AI computing infrastructure

GPU servers positioned to serve growing demand for AI computing capacity.

Solar energy integration

Photovoltaic generation supplying daytime power directly to the computing equipment.

Industrial electricity access

Grid and industrial supply that keep operations running around the clock.

Energy allocation flexibility

A management layer that can shift power between workloads as conditions change.

Transparent project updates

Published figures are labeled verified, estimated, planned or target — never blurred together.

Investor dashboard

Your investments, statuses and updates collected in one clear account view.

Ready to look closer?

Review the investment plans and the conditions that apply, then decide in your own time.