The farm, live

Real figures from the mining fleet and the public Bitcoin network, each with its label. The farm’s location stays private for security.

Fleet hashrate Estimate ≈ 212 PH/s 1,980 × Antminer S19 Pro, ≈ 218 PH/s nominal
Share of the Bitcoin network 0.02 % of 1,054 EH/s worldwide
Gross bitcoin output per day For investors: create an account to see it
Power in use Estimate 6.4 MW of 8 MW available
Solar on site Estimate 18 MWp panels on the farm
Bitcoin price $81,502.01 daily close 2026-10-23

Network data: mempool.space, updated 5 h ago. Bitcoin per day = our share of the network hashrate × 144 blocks × 3.125 BTC. It leaves out transaction fees, pool fees and downtime, so it is an estimate of gross output, before electricity and running costs. It is not the farm’s profit and not a forecast of investor returns.

The Bitcoin network today

Public data about the whole network, not only our farm. Our output moves with these numbers.

Network hashrate

1,054 EH/s now · 7-day average over 6 months

Bitcoin network hashrate over 6 months: from 929 to 1034 EH/s.

140.58 T last adjustment +5.92% on 16 Oct

Bitcoin mining difficulty over 6 months: from 132.47 T to 140.58 T.

Whole Bitcoin network · source mempool.space · updated 5 h ago.

Mining pool dominance

30 days

4,497 blocks found in the last 30 days

  • Foundry USA
  • AntPool
  • F2Pool
  • ViaBTC
  • SpiderPool
  • MARA Pool
  • Others

Share of blocks found by each pool · whole Bitcoin network · source mempool.space.

Power and compute

Where the farm’s electricity goes today, and what is planned.

  • Bitcoin mining: 100% of the power in use (6.4 MW) Estimate
  • AI compute: not running yet. The hall is built and cooled; the first GPU servers are planned about two months after launch. Planned
  • Headroom 1.6 MW for the next machines
  • Plan once GPUs run: about 70% mining and 30% AI compute. Planned

Infrastructure at a glance

The operator’s figures. Each one is labelled verified, estimate or planned.

Total land areaEstimate
50,950m²

About 50,950 m² of land.

Built areaEstimate
11,000m²

About 11,000 m² in use: mining halls and solar.

Mining hallsEstimate
3,000m²

About 3,000 m², plus a new hall for AI GPU servers.

Wind turbinesEstimate
12turbines

On the wider site of about 500,000 m².

Private operationEstimate
5years

About five years before opening to the public.

Project valueEstimate
30M USD

Land, mining machines, solar plant, halls, cooling and power lines (about 36–37 M USD invested).

Bitcoin mining allocationPlanned
70%

Initial agreed allocation — editable by an administrator.

AI computing allocationPlanned
30%

Initial agreed allocation — editable by an administrator.

Solar capacityEstimate
18MWp

About 18 MWp of solar panels on site.

Solar energy productionEstimate
28GWh/yr

About 40% of the farm's yearly energy.

Available electricityEstimate
8MW

Average from solar, wind and other sources: about 70 GWh a year.

Mining fleet consumptionEstimate
6.4MW

Continuous draw of the mining fleet.

Mining machinesEstimate
1,980machines

Antminer S19 Pro.

Fleet hashrateEstimate
207PH/s

About 207–218 PH/s for the whole fleet.